Question
“What are the components that need to be turned in for lab 2 in CAEE 201? I was told by the TA in the lab to only save the PDF of the sheet. On BBVista it says 20 points of the grade is the Revit model. Does this mean I needed to save my Revit file, and submit that also? Please let me know as soon as possible, because if that's the case I'm going to need to find time to re-do the lab.”
Answer
We’d like all the ingredients defined in the lab description. Since we’ve been a bit loose verbally I’m asking the TA’s to be lenient in the grading, but we want what it says under “Deliverables”:
- Revit Model submitted to VistaBB
- PDF of "Sheet showing product of Work" submitted to VistaBB
- Word document describing the experience, as defined above - Also submitted to VistaBB